The generic Preventive Maintenance (PM) procedures described below should be
performed regularly at the intervals indicated to provide the longest useful life possible
for the sterilizer. The recommendations assume an average number of daily cycles (4 –
6).

Operating at a higher or lower daily cycle rate may require an adjustment to the
PM frequencies recommended below. These recommendations take precedence over
those published in PRIMUS Operator Manuals. These manuals are currently being
updated.

Have Questions?

Healthcare questions | Chuck D’Angelone | 877.679.7800 | cdangelone@spire-is.com | cell: 860.385.0796

Life Science questions | Dave Schall | 877.679.7800 | dschall@spire-is.com | cell:  402 981 2582

www.spire-is.com

LYNX parts website

PRIMUS parts website

Back to Blog